IMXR® Job Training CBT Content -MRL Elevator Installation Process 3D Video

d620d817a652c.png

MRL Elevator Installation Process 3D Video

IMXR Job Training CBT Content




MRL elevator installation process 3D video educational content that has secured expertise through professional advisors, such as safety rules and laws to be familiar with during elevator installation work.

3a528222aa4b0.jpg

3df42e44e53e9.png

540967859fed3.png




Content Composition

  • The main elevator assembly process is expressed in 3D to provide a video similar to the actual situation for each installation process
  • Animated description of the on-site assembly process
  • Sound, narration, subtitle writing and production
  • Running time : more than 30 minutes


Picture Quality Standard and Sound

  • Resolution : 1,920 X 1,080 (FHD, 25 fps) or higher
  • Aspect Ratio : 16 : 9
  • Extensions : Universal extensions such as avi, mp4, mkv, etc.
  • Sound : Voice and environmental sound effects




Details of Content


b262b0322a12b.gif

83da1e949e533.gif

355673d1234c6.gif

01. Safety Tips02. Preparation03. Material Loading and Unloading


f031c35f3f4b4.gif

75920a3e91acf.gif

3edb6767e8a88.gif

04. Shielding of Doorway Openings05. Installation of Upper Platform06. Electric Winch and Lifting


64c99ccc8738d.gif

98a03f4fc9782.gif

2807da76fd125.gif

07. Installation of Upper Template08. Installation of Eye Nut for Hanging the Rail09. Installation of Temporary Overspeed Regulator


e88949852e812.gif

d31447dd0c172.gif

22a811597df78.gif
10. Installation of Lower Template11. Hanging Rail12. Installation of Car Frame


897c59052c207.gif

18d202ac6d7e9.gif

f81caea8d8fa9.gif

13. Car Hanging Work, etc.14. Installation of  Drive Unit15. Driving at Low Speed


c89d5788dbe8e.gif

b5687373a9ccb.gif

c6d24056a7a67.gif

16. Installation of Hanging Devices17. Installation of Doorway18. Installation of Hoistway Cable


2ad7b5d0be74e.gif

6140e76f6ee9b.gif

de8938fcec646.gif

19. Installation of Car Panel20. Installation of Car Parts21. Installation of Car Door Operator


64bee62aaf849.gif

6c83aa15b4911.gif


22. Installation of Hoistway Components23. Driving at High Speed


IMXR Job Training CBT Content (MRL Elevator Installation Process 3D Video) Preview




User l  d6e377c5224c5.jpg


(48732) 10th floor, 244, Jungang-daero, Dong-gu, Busan (Choryang-dong, Heungkuk Life Insurance Busan office building)

TEL : 1600-1663 

FAX : 051-977-0302 

 MAIL : info@samwooim.com