IMXR® Job Training VR Content - Lift: Elevator Installation

b369d953aa948.png

Lift - Elevator Installation

IMXR Job Training VR Content




In order to maximize the training effect for each elevator installation job training procedure, training scenarios are configured according to the NCS-based work system procedure, and this content enables repeated and systematic job training for elevator installation. The training content consulted and reviewed by a professional organization considered not only the age and expertise of the training target, but also the educational purpose and effect. In addition, to control education and training, a remote management module is provided to continuously check the training situation.




Product registered with Public Procurement Service Venture Nara

ca75d11c0b3bc.png

IMXR Job Training VR Content (Lift - Elevator Installation) has been designated as a venture start-up innovative procurement product that the Public Procurement Service supports to expand public purchase channels according to the Venture Nara Registered Goods and Services Designation Management Regulations.

(Venture Nara item identification number : 24920041)
34485f43dd2da.jpg


Expected effect

1. Increase technical capabilities


Maximize the experience effect of trainees through support for manipulation similar to reality


9fb03d0370707.jpg
2. Realistic and immersive
 educational materials

Maximize trainees' sense of reality and immersion through realistic modeling


ab983ad96501f.jpg
3. Support a Continuous Training


Supports a lecture system that supports continuous interaction between instructors and trainees


715b33192ead8.jpg


Composition

  • Educational program function : NCS-based job training and technical advice from an expert belonging to an elevator company to implement and complete a scenario
b9463aa52cd53.jpgdfe7da607182b.jpgfed483473bae9.jpg310a748f693ed.jpg
Elevator InstallationElevator InspectionEscalator InspectionSafety Accident Prevention Education


  • Learning support system : Classroom/instructor management, training result search, and learning situation search function for administrators to check student learning information
d10b8c99dae14.jpg9883f4257d422.jpgc6c77fdc28591.jpg21a5405bfbc9a.jpg
Learning Guidance ManagementClassroom / Instructor ManagementTraining SearchLearning Situation Search


  • Integrated management function (VR simulation function) : Provides necessary functions for the operator to train trainees (3D rendering quality setting, 3D viewer adjustment, scenario repetition setting, etc.)
1318ab2933307.jpg9464ae0c1aace.jpg9258d7b972930.jpgefe9e82ae1917.jpg
3D Rendering Quality Settings3D Viewer AdjustmentsCheck the Completeness of WorkScenario Repeat Settings


  • Possession of English version : Provides an English version other than Korean so that trainees from various countries can participate
9cea4d484b2a8.jpg315b851dab1d5.jpga09f24a81978a.jpg5d63005830766.jpg
English version of the same content




Contents

[1] Protective Measures Before Installation

72b5c9cd34c1c.gifc8dc628eb8ae4.gif
Worker wearing safety protective equipmentShielding of platform openings on each floor


[2] Installation of the template

4b8ac59b835ac.gifa6eff4ac16589.gif
Installation of doorway templatesCar, counter rail template installation and welding


[3] Working the Rail Lifting

03287eb6e6a14.gif863f1723fc1ee.gif
Hang the jig on the shackle and tighten the boltFixing jigs for rail hanging


[4] Working in the Machine Room

7551c4e7c49fe.gif75d5cd6e4c2e5.gif
Position of winding machineInstallation of overspeed regulator


[5] Working the First Stage Rail

071009e2db0ab.gif8e4162583af83.gif
Installation of the car rail bracketWelding car rail brackets


[6] Installation of the Car Frame

59ac1d521a3d2.gifb8e04e1ba53ac.gif
Installation of suspension sheave for carFixing the overspeed regulator tensioning device


[7] Working the Rope

b8356aa1db8c5.gifed69c17a80264.gif
Double wrappingInstallation a rope breakaway prevention device on the counterweight sheave


[8] Assembly the Temporary Car

12ac6aa1589e8.gif346c1f6808ecb.gif
Installation of support railingsInstallation of the suspension sheave cover


[9] Installation the Rails

c43b749b9cd60.gif826b31e9b3470.gif
car riseMove to the lowest floor after installation


[10] Installation of Platform

286c3c792ba9e.gifdb4cea6e53e8d.gif
Installation of door operatorInsert door shoe


[11] Working the car panel and Compenchain

0dc2522024150.gifa2af397678ed5.gif
Add counterweight weightInstallation of compenchain


[12] Working the car operator

4746edfb18cb4.gif69130bae61919.gif
Installation of car door operatorInstallation of the CWT suspension sheave cover


[13] Installation of Inspection Control Panel

9a96af47672a1.gif0b3760e3d76cf.gif
Elimination of working lightingInstallation of permanent lighting


IMXR Job Training VR Content (Lift - Elevator Inspection) Preview




User l 113e14f6f1987.jpg


[Recommended specifications and specs of content]

c138f62f72c19.jpg

e25c9c070103f.jpg


(48732) 10th floor, 244, Jungang-daero, Dong-gu, Busan (Choryang-dong, Heungkuk Life Insurance Busan office building)

TEL : 1600-1663 

FAX : 051-977-0302 

 MAIL : info@samwooim.com